date:Oct 26, 2012
The facility will be located at Euroports Breakbulk Terminal at the Left Bank in the Port of Antwerp (Quay 1207) and will have a cold and dry store area warehouse. Construction of the 13.950 m facility started in September 2012 and the operation is expected to go live in Q1 2013. Bolckmans NV is the contractor for this project.
This new plant will require an investment of 8.2 mio. A new joint-venture company, EuroFruitPorts, will handle temperature controlled import fruit, mainly from Afri