Steel Structure Flour Milling Plant
ened building time. Hence, the investment will be returned much faster.
c. It takes a short time to finish installation and pilot run. For example, the installation time for the 140TPD is only 60 days.
d. Due to the limited building height, the construction cost is only 1/2 or 1/3 of mulit-storey type.
2. Complete Product
a. The steel fram is manufactured from high quality steel that is provided by Wuhan Iron and Steel (Group) Corp. The steel columns and supporting parts are welded by 5mm steel
2/5 next page prev page home page last page
go back |  refresh |  WAP home |  Web page version  | login
04/30 18:31