Using the sun to “crack” almonds
date:Oct 10, 2012
for TP installed on both the south face of the Hull Storage Barn and atop the Elevated Solar Structure used to both generate energy and store TP Farm equipment. The two installations will feature 3,024 Conergy PM 240P Watt solar modules and 3.9 miles of Conergy Mounting System rail. Producing 1,138,280 kWh annually, the installations will prevent the release of more than 892 tons of harmful CO2 greenhouse gas per year, reduce energy consumption, and save millions in electricity costs for TP.
2/5 next page prev page home page last page
go back |  refresh |  WAP home |  Web page version  | login
06/08 02:09