Fonterra builds world’s first earthquake-proof whole milk drying plant
date:Nov 12, 2015
hem enough slack while being supported adequately as well, says Reynolds.

The human interface zones (corridors between the fixed and base isolated sections) also have to be able to move as the building operates under critical hygiene conditions, making any breach to ambient air unacceptable.

The building is made from pre-cast concrete panels and columns fabricated in Otaki and lifted into position.

Our goal was to change the way construction was done in New Zealand, says Reynolds. We brought
7/8 next page prev page home page last page
go back |  refresh |  WAP home |  Web page version  | login
07/08 19:02