date:Jul 09, 2014
ntrol set point, it decides when more or less steam time is required. In plants where current steam time management is good, the introduction of the Peel Scanner can achieve a peel loss reduction of 0.25 to 0.5%, and in plants where current steam time management is poor, the savings can be much greater. As the scanner can differentiate between peel and all other defects it ensures that the steam peeler is only peeling for skin and not defects (Fig.4).
THE ORBIT REVOLUTION: The driving force be