date:Jun 20, 2014
l season. The collaborative relationship between GEA and Fonterra set the foundation for a great project and a great plant. Drier 2 at Darfield plays an important role in Fonterras strategy to meet the strong demand for dairy nutrition around the world.
Fonterras Darfield site is located 45 km from Christchurch, New Zealand. The site includes two milk powder spray drying plants, both built by GEA. The first was put into operation in 2012 with a capacity of 15 tonnes/hour and the second, Darfiel