date:Dec 11, 2013
ut the need to add equipment to the plant room. This helped the client to minimise investment cost.
Star worked closely alongside the main contractor throughout the project. As well as the design, build and commissioning of the refrigeration system, Star was responsible for the supply and installation of pipework, ducting, wiring, control panels and AHUs (air handling units).