Fabricae Stainless completes project for dairy ice cream client in New South Wales
date:Feb 16, 2013
the CNC waterjet cutter, to ensure a high degree of accuracy. The pumps and stainless-steel tanks were piped to the CIP system and also to the glycol system.

The fourth room was the CIP (clean in place) room. This consisted of three stainless-steel tanks, a pump and a tubular heat exchanger. The heat exchanger was piped up the steam and condensate lines. By using the CIP system it ensured that all pipework, pumps, valves, probes and tanks could be hygienically cleaned at any time with the push
4/5 next page prev page home page last page
go back |  refresh |  WAP home |  Web page version  | login
06/25 12:25